Step 1
Cut out the required piece of flooring in order to incorporate the drain element.
Step 4
Connection and positioning of the drain body to the pipe. The upper edge of the drain flange should be at the same height as the wooden floor.
Step 5
Fill the box work element with mortar up to the upper edge of the drain flange. Ensure that the mortar is laid as a solid bed in the area around the drain.
Step 6
Reinsert the previously cut sections of flooring.
Step 7
If necessary, pre-treat the wooden surface with primer before bonding the element.
Step 8
Attach the sealing collar to the back of the Fundo with 4 screws. Hand-tighten the screws.
Step 9
Apply tile adhesive to the entire underside of Fundo Riolito, and bond it to the substrate.
Step 14
Seal the joints with the wedi 610 adhessive sealant and wedi Tools reinforcement tape. Then, install the wedi Fundo Riolito profile.
15
Use the enclosed tiling guides. They ensure the correct distance between cover and tile is maintened.