Point drainage on suspended timber floors - Fundo Ligno Plus
Floor-level shower systems
In addition to the integrated version, the wedi Fundo Ligno Plus floor element can also be installed on the suspended timber floor. The height-adjusting wedi building boards are also used in this installation prozess, which is just as simple as the previous ones. Here, the joins are sealed with wedi 610.